Home | About Us  |Decisions | Construction Log | Photo Albums | Other Builder Web Sites | Misc Links

 
                                                                                       FINAL ASSEMBLY

                                             
                                                  
Date         Description                                                     Hours    

                                                (click links for details)

                                                  10/12/08   Initial steps at reassembly                                     2.00

                                                  10/16/08   Empennage attach                                                3.50
                   
                                                  10/17/08   Emp attch &  seat supports & wiring                       2.50

                                                  10/24/08   Move hangar,torque, safety prop bolts                     3.50

                                                  10/28/08   Rewire, install mid seat supports, alt                      2.50

                                                  11/03/08   Install & adjust elevator trim tabs                           4.50

                                                  11/05/08   Install Rudder and connect cables                          2.75

                                                  11/11/08   Secure elec wires & Fab Scat reducers                  3.75

                                                  11/13/08    Fix R fuel line reinstall Bowers Ram Air                 5.25

                                                  11/20/08    Comp inst, Rdr bracket, fuel line test                     6.25

                                                  11/21/08   Rplace Mag blast tubes w/mach fitngs & scat         2.75

                                                  11/26/08   Replace Brake lines w/ Bonaco lines                      6.00

                                                  12/02/08   Fill and bleed brakes                                             2.00

                                                  12/04/08    Fix rubbing of VS and rudder, clean static sys        2.50

                                                  12/08/08    Fix ram air control interferrance w/ lower cowl         3.25

                                                  12/09/08    More Ram air fix and new exhaust brackets           3.25

                                                  12/11/08    Neporene coupling between cowl and engine         3.25

                                                  12/13/08    Prop spinner, Seat rails, XM receiver, Exhaust       3.00

                                                  12/16/08    Begin Install seats and seatbelts                          2.00

                                                  12/22/08    'Final' tunnel close out + TCW EFIS module          2.50

                                                  01/02/09    Installed new exhaust hangers & straps                3.00

                                                  01/05/09    Installed TCW power & secured fuel & brake lines 3.00

                                                  01/07/08    Center console, radios, fixed fans, door hinge hw  4.00

                                                  01/09/09    Door hardware and Front seat install,                   3.00

                                                  01/13/09    Flap gap tape, overhead closeout and antenna      3.00

                                                  01/16/09    COM antennas, baggage door seal, panels           2.50

                                                  01/17/09     Frwd Fuse upholstery panel (pilot side)               2.00

                                                  01/21/09     Calib. AHRS, Side panels, front panels               5.00
                                     
                                                  01/22/09     Pilot side panel                                                 3.00

                                                  01/23/09     Paint prep side panels                                       3.00

                                                  01/26/09    Paint side panels                                                2.50

                                                  01/28/09    inst.side panels, rt door latch, dn elevator stop      4.50

                                                  01/29/09    Prep Glareshield for paint                                     4.00
 
                                                  02/03/09    Paint glareshield and hang wings                          4.50

                                                  02/04/09    Torque wing bolts and attach wing root fittings        1.50

                                                  02/05/09    Adjust aileron linkage and hang ailerons                4.00

                                                  02/06/09    Install & rig flaps                                                 4.50

                                                  02/09/09    Wing tips, landing lights and align ailerons             4.00

                                                  02/10/09    Left wing landing light and wing tip lens                 1.00

                                                  02/11/09    Matco nose wheel axel spacer and bearing adj       2.50

                                                  02/12/09    Flush fuel tanks & misc stuff                                 3.00

                                                  02/20/09    Debug and repair systems                                  10.00

                                                  02/25/09    Misc fixes and Weight and balance                       5.00

                                                  03/06/09    DAR inspection and AW Cert!!!!!!!!!!!!!!!!!!!                  2.50

                                                  03/13/09    Misc stuff & wing walk                                          2.00

                                                  03/16/09    Bits and pieces                                                    1.50

                                                  03/17/09    Remount Autopilot programmer                              2.50

                                                  03/20/09    Fiberglass and repaint center console                     4.50

                                                  03/31/09    Reinstall center console and autopilot pgmr             2.00

                                                  04/10/09    Odd's and ends , plenum & cowl                            2.50

                                                  04/11/09    Pro Seal door seal to cabin cover                           2.50
                                                  

                                         
                                                                                                             TOTAL                  171.50    
                                                                             
                                                                           
Quick Links

EMPENNAGE

Vertical Stabilizer

Rudder
Horizontal Stabilizer
Elevators
Tailcone
Empennage Attach
Empennage Fairings


WINGS

Main Spars
Wing Ribs
Rear Spars
Top Skins
Outboard Leading Edge
Stall Warning System
Fuel Tanks
Bottom Skins
Ailerons
Flaps
Aileron Activation
Wing Tip Installation


FUSELAGE

Mid Fuse Bulkheads
Mid Fuse Ribs and Skins
Firewall
Fwd Fuse ribs and Skins
Fuse Side Skins
Step Installation
Upper Fwd Fuse Assembly
Tailcone Attachment
Baggage Area
Baggage Door
Access Covers Floor Panels
Brake Lines
Fuel System
Rudder Pedals and Brakes
Control System
Flap System
Upper Fwd Fuse Installation
Rear Seat Backs
Cabin Cover
Wing Attachment

FINISHING