Home | About Us  |Decisions | Construction Log | Photo Albums | Other Builder Web Sites | Misc Links

 
                                                      Section    Description             Step/s        Date         Hours                 

                                                                   (click link for details)           
                                                         18-2   Fuel Tanks                    1               10/20/05         1.0     
                                                         18-2                                        1-4            10/21/05         6.00
                                                         18-3                                       5-6&1-3      10/21/05         2.00
                                                         18-3                                       3-4             10/22/05         0.75
                                                         18-4  left tank                         1-7l            10/23/05         3.25 
                                                         18-2&3&4 right tank                many          10/24/05         6.25 
                                                         18-4 left tank                           8-9            10/24/05         1.60
                                                         18-4 right tank                         8-9            10/25/05         4.20
                                                         18-4 left and right                    8-9lr           10/31/05         2.50
                                                         18-5 l&r                                  1-5             10/31/05         3.00
                                                         18-5 get ready fror Pro Seal      2               10/31/05         1.25
                                                         18-5 Pro-Seal started              2-3             11/01/05         6.70
                                                         18-5  Pro Seal Continues!       4-5              11/02/05         8.25
                                                         18-5  Left tank ribs                  6               11/03/05         4.60
                                                         18-5  Finsih left tank ribs        6c               11/04/05         6.70
                                                         18-5 Start Right tank ribs         6               11/05/05         3.30

                                                         18-5 Finish Right tank ribs       6c              11/07/05         5.00
                                                         18-5 J channel Left Tank         7                11/07/05         1.75
                                                         18-5 J channel Right Tank       7r               11/08/05         1.50
                                                         18-5 attach brackets L&R        8                11/08/05         1.40
                                                         18-6 Fuel Vent lines               1-6               11/09/05         3.50
                                                         18-6 Inboard Rib RIGHT         1-6c             11/09/05         0.01
                                                         18-6 Inboard rib LEFT            1-6l              11/10/05         1.50
                                                         18-7 Fuel Senders                 1-3               11/10/05         1.70
                                                         18-8 Left tank sealed !           1-3l              11/11/05         5.40
                                                         18-8 Right tank sealed !         1-3r              11/12/05         4.70
                                                         18-8 1st leak test                   test1            12/15/05         0.60
                                                         18-8 leak repair                     repair            12/16/05         0.75
                                                         18-8 leak test 2 & repair         test2            12/17/05         1.10
                                                         18-8 Attach right tank to spar   5R              01/13/06         2.90
                                                         18-8 Attach left tank to spar     5L              01/28/06         2.00

                                                          
FINISHED!    
                  

                                                                                                                        Total               95.16
                                
Quick Links

EMPENNAGE

Vertical Stabilizer

Rudder
Horizontal Stabilizer
Elevators
Tailcone
Empennage Attach
Empennage Fairings


WINGS

Main Spars
Wing Ribs
Rear Spars
Top Skins
Outboard Leading Edge
Stall Warning System
Fuel Tanks
Bottom Skins
Ailerons
Flaps
Aileron Activation
Wing Tip Installation


FUSELAGE

Mid Fuse Bulkheads
Mid Fuse Ribs and Skins
Firewall
Fwd Fuse ribs and Skins
Fuse Side Skins
Step Installation
Upper Fwd Fuse Assembly
Tailcone Attachment
Baggage Area
Baggage Door
Access Covers Floor Panels
Brake Lines
Fuel System
Rudder Pedals and Brakes
Control System
Flap System
Upper Fwd Fuse Installation
Rear Seat Backs
Cabin Cover
Wing Attachment


FINISHING