| Finish riveting w/Pro Seal all of the remaining ribs in the LEFT tank, also installed and riveted the Fuel cap Flange and vent line |
|
| retainer clip. w/ Pro Seal. It takes about 1.5 hours per rib, the riveting actually goes pretty fast, it's all of the Pro Seal prep and |
|
| clean-up along the way that takes the time. I'm getting tired ot TANKS and Pro Seal, I can see why some have moved ahead to |
|
| other parts, this is a GRIND. |
|