Home | About Us  |Decisions | Construction Log | Photo Albums | Other Builder Web Sites | Misc Links

 
                                                   Section    Description             Step/s        Date         Hours                 

                                                                   (click link for details)           
                                                      15-2     Aileron brackets           1-7         12/27/05      2.25
              

                                                      15-3    Spar Doublers               1-4         12/28/05      1.25
     

                                                      15-4    Match Drill to Ribs (R)    1-7         12/29/05      1.75
                                       

                                                      15-4     Rivet Right Spar to ribs 3-4         12/30/05      2.50
   

                                                      15-4     Left wing                      1-4L       01/19/06      4.75      
                                        
                                     
                                                      
15-4  FINISHED                                       
            

                                                                                                               TOTAL         12.50
                                  
Quick Links

EMPENNAGE

Vertical Stabilizer

Rudder
Horizontal Stabilizer
Elevators
Tailcone
Empennage Attach
Empennage Fairings


WINGS

Main Spars
Wing Ribs
Rear Spars
Top Skins
Outboard Leading Edge
Stall Warning System
Fuel Tanks
Bottom Skins
Ailerons
Flaps
Aileron Activation
Wing Tip Installation


FUSELAGE

Mid Fuse Bulkheads
Mid Fuse Ribs and Skins
Firewall
Fwd Fuse ribs and Skins
Fuse Side Skins
Step Installation
Upper Fwd Fuse Assembly
Tailcone Attachment
Baggage Area
Baggage Door
Access Covers Floor Panels
Brake Lines
Fuel System
Rudder Pedals and Brakes
Control System
Flap System
Upper Fwd Fuse Installation
Rear Seat Backs
Cabin Cover
Wing Attachment


FINISHING