Construction Log Report
Report Created by KitLog Pro
Printed:
1/13/2006
 7:44:16PM
40406
40313 N Candlewyck Ln
Van's Aircraft
RV-10
Kit Manufacturer:
Kit Model:
Kit Serial Number:
Anthem, AZ 85086
Deems Davis
Owner City/State/Zip:
Owner Address:
Owner Name:
Manual Reference #
Category
Date
Partner
Hours 
1/13/2006
Fuel Tanks
 2.90
Sec 18-8
Installed the Right Fuel Tank to the wing/spar assembly. Began by deburrung dimpling all of the #8 screw holes, the plans say to 
use the C-frame for a better dimple, but with the tanks already assembled, there is no way to do that, I experimented with a 
sample .032 scrap and got the pneu squeezer to get Very close to the same result. Judy was out running around this AM so I 
was able to wrestle the tank into position under the cradle, and proped it up with some parts bins and was able to get a screw 
into 1st one corner and the an opposite one, I found that rather than trying to get all of the #8 screws in that it was better to put in 
th AN 4-4 bolts, as those snug up the tank and draw it really tight against the OBLE. This is where you really appreciate the 
beauty of this match drill, and pre-punched process, when you build all of these parts seperately and then assemble them 
together and there's not a whisker too much or too little room, it's truely amazing just how accurate this process is even 
considering there are No jigs!!!!!, Torques all of the bolts, applied Blue Torque-Seal.
Blue Torque-Seal applied to all AN bolts/wahers/nuts
All buttoned up
Dimpling skin for #8 screws
Page 1 of 1