Construction Log Report
Report Created by KitLog Pro
Printed:
11/11/2005
 3:21:04PM
40406
40313 N Candlewyck Ln
Van's Aircraft
RV-10
Kit Manufacturer:
Kit Model:
Kit Serial Number:
Anthem, AZ 85086
Deems Davis
Owner City/State/Zip:
Owner Address:
Owner Name:
Manual Reference #
Category
Date
Partner
Hours 
11/11/2005
Fuel Tanks
 5.40
Sec 18-8
Install Aft Tank Baffle and attach zee's for LEFT tankThe end of Pro-Seal is in sightI had a minor incident when one of the 
pop rivets broke the stem mid-way through the pullit ended up jamming the pop-pullerA quick trip to Ace hardware for 
another puller, and then finished up attaching the zee'sI took the dremel cutoff tool and cut the stem flush with the rivet head, I 
hope that it's pulled tight enough for a seal, drilling it out and leaving rivet bits rattleing around the tank, didn't seem like the 
right thing to doI'll be happy to see the end of PS, It seems to make the job time longer, what with the stop to wipe the goop 
off, clean up the tool, clean off the cleco's, clean off the hands, repeat all of the above about 100 times, I've gone through 1 1/
galons of Acetone, and 1/galon of MEK, and about 3-rolls of paper towels so farI've gotten to the point that I can't even 
smell the fumes (probably a sign that I'm burning too many brain cells in the process). All in all I'm really happy with the way the 
Left tank came out, I don't think I'll have any leaks but I'll wait 2-weeks before testing to make sure everything is cured well.
LEft Tank DONE !!! except for the "10
non-countersunk holes
Applying 3/16  bead
Cake decorating PS dispenser
Page 1 of 1