                                                      Section    Description                  Step/s                 Date         Hours                 

                                                                   (click link for details)           
                                                        Panel-1   Instrument Panel                 1                 08/07/06     3.25
                                                        Panel-2   Phys mount EFIS&MFD      1                  08/08/09     4.25
                                                        Panel-3   Side panels                        1                  08/09/06     3.25
                                                        Panel-4    Center Radio stack            1                  08/10/06     4.75
                                                        Panel-5    Dynon backup EFIS           1                  08/11/06     1.50
                                                        Panel-6    Batteries and contactors    1                   08/14/06     4.50
                                                        Panel-7    Pitch Servo & AHRS          1                   08/17/06     3.75
                                                        Panel-8    Strobe Power & ELT          1                   08/19/06     2.25
                                                        Panel-9    Pulled Aft Fuse wires fwd   1                   08/21/06     2.00
                                                        Panel-10  D10A mag sensor              1                   08/22/06     1.50
                                                        Panel-11  Finished Aft Fuse wiring     1                   08/23/06      2.50
                                                        Panel-12  Wiring the Center Stack     1                   08/29/06      5.50
                                                        Panel-13  More Radios & ADC          1                    09/06/06     7.00
                                                        Panel-14  Lighted rocker switches     1                    09/08/06     5.50
                                                        Panel-15 Mount autopilot pgmr          1                    09/09/06     5.75
                                                        Panel-16 Mate autopilot & console     1                   09/12/06     0.50
                                                        Panel-17 Power distribution               1                   09/13/06     5.00
                                                        Panel-18 Pilot/co- HS & mic plugs     1                   09/14/06     4.50
                                                        Panel-19 EIU & Autopilot to EFIS       1                   09/15/06     3.75
                                                        Panel-20 Switches & disconnects      1                   09/16/06     4.00
                                                        Panel-21 complete RS232 connect    1                   09/18/06      3.25
                                                        Panel-22 1st powerup & config          1                    09/19/06      3.00
                                                        Panel-23 Initial checkout                  1                    09/20/06      2.25
                                                        Panel-24 Debugging                         1                    09/21/06      2.25
                                                        Panel-25 More debugging                 1                     09/22/06     4.00
                                                        Panel-26 Rework                             1                     09/23/06      3.00
                                                        Panel-27 Install Dimmers (3)             1                    09/25/06      4.50
                                                        Panel-28 Check-out                          1                    09/27/06      0.50
                                                        Panel-29 Recontour Overlay              1                    05/21/07      5.50
                                                        Panel-30 Attach CNC subpanels       
1                    06/21/07      7.50     
                                                        Panel-31 Prepare subpanels f/paint   1                     07/07/07     5.50
                                                        Panel-32 Prime all subpanels            1                    07/08/07     3.50
                                                        Panel-33 Final Paint Panel                1                    07/09/07     4.25
                                                        Panel-34 Silkscreen Layout               1                    07/30/07     5.50
                                                        Panel-35 Silkscreen panel                 1                    08/04/07     5.00
                                                        Panel-36 Prepare to install in Cabin    1                    10/30/07    4.25
                                                        Panel-37 Physically installed panel    1                    10/31/07     5.50
                                                        Panel-38 Electrical connections         1                    11/01/07    2.25
                                                        Panel-39 More connectioins               1                    11/06/07    4.00
                                                        Panel-40 More electrical connects      1                    11/08/07    5.00
                                                        Panel-41 PANEL INSTALLED !!          1                    11/09/07    5.25
                                                         
                                                                                                                        

                                                                                                                                   Total      160.75
                         
Quick Links

EMPENNAGE

Vertical Stabilizer

Rudder
Horizontal Stabilizer
Elevators
Tailcone
Empennage Attach
Empennage Fairings


WINGS

Main Spars
Wing Ribs
Rear Spars
Top Skins
Outboard Leading Edge
Stall Warning System
Fuel Tanks
Bottom Skins
Ailerons
Flaps
Aileron Activation
Wing Tip Installation


FUSELAGE

Mid Fuse Bulkheads
Mid Fuse Ribs and Skins
Firewall
Fwd Fuse ribs and Skins
Fuse Side Skins
Step Installation
Upper Fwd Fuse Assembly
Tailcone Attachment
Baggage Area
Baggage Door
Access Covers Floor Panels
Brake Lines
Fuel System
Rudder Pedals and Brakes
Control System
Flap System
Upper Fwd Fuse Installation
Rear Seat Backs
Cabin Cover
Wing Attachment

FINISHING