8/10/2006
Panel
 4.75
Panel-4
Finished up the side panels I had to cut out the mounting panel on the pilot side to make room, and then creat a hole for the 
compass to pass through. Also mounted the HOBBS meter. Then on to the center stack, I wanted to mount everything as high 
as possible, the limitation is the center rib. Even with the modification I made to strengthen it and to make more room, There is 
still a restriction, The SL 30 & SL40 are over 11" long, so they went at the bottom of the stack. I've been nervous as heck about 
this whole panel thing. Mostly because I can't have the panel inserts cut by CNC/water jet, so I'm having to do it all by hand, and 
The panel is one of the things that really needs to look nice, as that's what I'm going to be looking at most of the time while flying. 
I'm finding that with some careful filing that it's going pretty well. I'm taking a LOT more time than on the plans sections, hope its 
all worth it. Tomorrow I'll mount the Dynon back-up EFIS. The DigiFlight ll VSGV is on order from Stein. It will go directly below 
the radios and above the Dynon. The Throttle, Prop & Mixture will be mounted at the bottom .
Center stack installed. mounting screws interfer on 
top two bays
Hobbs Meter installed on breaker panel
Pilot side panel installed