Construction Log Report
Report Created by KitLog Pro
Printed:
8/10/2006
 7:59:15PM
40406
40313 N Candlewyck Ln
Van's Aircraft
RV-10
Kit Manufacturer:
Kit Model:
Kit Serial Number:
Anthem, AZ 85086
Deems Davis
Owner City/State/Zip:
Owner Address:
Owner Name:
Manual Reference #
Category
Date
Partner
Hours 
8/10/2006
Panel
 4.75
Panel-4
Finished up the side panels I had to cut out the mounting panel on the pilot side to make roomand then creat a hole for the 
compass to pass throughAlso mounted the HOBBS meterThen on to the center stackI wanted to mount everything as high 
as possiblethe limitation is the center ribEven with the modification I made to strengthen it and to make more roomThere is 
still a restrictionThe SL 30 SL40 are over 11longso they went at the bottom of the stackI've been nervous as heck about 
this whole panel thingMostly because I can't have the panel inserts cut by CNC/water jetso I'm having to do it all by handand 
The panel is one of the things that really needs to look niceas that's what I'm going to be looking at most of the time while flying
I'm finding that with some careful filing that it's going pretty wellI'm taking a LOT more time than on the plans sectionshope its 
all worth itTomorrow I'll mount the Dynon back-up EFISThe DigiFlight ll VSGV is on order from SteinIt will go directly below 
the radios and above the DynonThe ThrottleProp Mixture will be mounted at the bottom .
Center stack installedmounting screws interfer on 
top two bays
Hobbs Meter installed on breaker panel
Pilot side panel installed
Page 1 of 1