Yesterday, I figured out the wiring physical runs for the Electrical power distrubution system. I'm using the Z14 Dual Battery Dual |
|
Bus, Dual Alternator architecture. After getting the wiring sizes and runs identified, I bought some #4 and #2 welding cable, and |
|
terminals, and some more #10 AWG. Today, I fabbed the mounting plates for the contactors, drilled and mounted them. I'm |
|
mounting each battery contactor aft with each battery, I'm also mounting the Cross Feed contactor Aft as well, There doesn't |
|
appear to be any way to avoid having to pul a #2 and a #4 AWG cable from the aft section up to the firewall/panel.Fabbed a |
|
ground tab to ground both batteries to the airframe. Spent the rest of the time cutting and fabricating #4  cables per B. |
|
Nuckols instructions and soldered on the appropriate terminals and connected per the Z14 diagram. I still need to run a #4 and a |
|
#2 cable from the battery/contactor assembly forward. I started pushing the #2 through the conduit, but it's slow going and not |
|
|