Physically assembled the 2 outboard panels in the instrument panel. The circuit breaker panel was first. I still need to add the |
|
Hobbs meter to the bottom of the panel. The moved to the pilot side panel. I was going to use the Cessna Batt/Alt switch/s , but |
|
trying to locate them became a problem. so I went back to the B&C switches. ! Primary master/Alt 2. Sec Master.Alt & 3. the |
|
lower left corner is left for the eyeball vents (enroute from Steinair) Crossover and Starter. I need to cut the attach bracket behine |
|
the pilot side panel. I cut the circuit breakers with the step drill, Cut the Compass and Clhronometer using a fly cutter I got @ |
|
OSH. Had to buy bigger step drill to cut the Mag key/Switches. |
|