Construction Log Report
Report Created by KitLog Pro
Printed:
9/16/2006
 8:29:36PM
40406
40313 N Candlewyck Ln
Van's Aircraft
RV-10
Kit Manufacturer:
Kit Model:
Kit Serial Number:
Anthem, AZ 85086
Deems Davis
Owner City/State/Zip:
Owner Address:
Owner Name:
Manual Reference #
Category
Date
Partner
Hours 
9/16/2006
Panel
 3.50
Switches & pwr
Another day of head scratching, I find hat with the airframe I spend 1 out of 10 hours doing research/planning etc. With wiring, 
it's just the opposite, I spend 10 hours of planning/designing/reasearch, double checking for each hour of actual labor expended, 
makes the whole process go much slower as I'm logging pretty much actual labor time vs the total. I ran power from the circuit 
breakers to all of the rocker switches, also ran power to the lights on the rockere switches in the console. The switches in the 
panel all go to things external to the panel and will get connected to their respective devices when the panel gets mounted in the 
airframe. I need to connect the switches in the console to the devices they control  (and put a disconnect between) and then I 
should be ready for a continuity check of all connections and following that a power on test of the avionics. I've been puzzeling 
over the connections to the rocker switches, I can 'make' the fast-on terminals 'work' with some coaxing, but I'm uncomfortable, 
so I'll go ahead and test it this way, but I'll either order some terminals from Stein and solder some wire with 'real' faston 
terminals to the switches or attempt to find some quick connect terminals that can be crimped and attach directly to the .110 
terminals.
Ditto
Only thing left here is to connect the switches to their 
devices
Page 1 of 1