Construction Log Report
Report Created by KitLog Pro
Printed:
9/16/2006
 8:29:36PM
40406
40313 N Candlewyck Ln
Van's Aircraft
RV-10
Kit Manufacturer:
Kit Model:
Kit Serial Number:
Anthem, AZ 85086
Deems Davis
Owner City/State/Zip:
Owner Address:
Owner Name:
Manual Reference #
Category
Date
Partner
Hours 
9/16/2006
Panel
 3.50
Switches & pwr
Another day of head scratchingI find hat with the airframe I spend out of 10 hours doing research/planning etcWith wiring
it's just the oppositeI spend 10 hours of planning/designing/reasearchdouble checking for each hour of actual labor expended
makes the whole process go much slower as I'm logging pretty much actual labor time vs the totalI ran power from the circuit 
breakers to all of the rocker switchesalso ran power to the lights on the rockere switches in the consoleThe switches in the 
panel all go to things external to the panel and will get connected to their respective devices when the panel gets mounted in the 
airframeI need to connect the switches in the console to the devices they control  (and put a disconnect betweenand then I 
should be ready for a continuity check of all connections and following that a power on test of the avionicsI've been puzzeling 
over the connections to the rocker switchesI can 'makethe fast-on terminals 'workwith some coaxingbut I'm uncomfortable
so I'll go ahead and test it this waybut I'll either order some terminals from Stein and solder some wire with 'realfaston 
terminals to the switches or attempt to find some quick connect terminals that can be crimped and attach directly to the .110 
terminals.
Ditto
Only thing left here is to connect the switches to their 
devices
Page 1 of 1