Construction Log Report
Report Created by KitLog Pro
Printed:
9/18/2006
 9:26:34PM
40406
40313 N Candlewyck Ln
Van's Aircraft
RV-10
Kit Manufacturer:
Kit Model:
Kit Serial Number:
Anthem, AZ 85086
Deems Davis
Owner City/State/Zip:
Owner Address:
Owner Name:
Manual Reference #
Category
Date
Partner
Hours 
9/18/2006
Panel
 3.25
Finish EFIS wiring
Finished up wiring the last of the RS 232 connections to both the EFIS and the MFDneeded to run out and get a little more 
shielded conductor and some plug Molex connectorsGo those done and cleaned up some wiring runsThen ran continuity 
checks on all of the EFIS/MFD connections to the various devices they connect toFound one problem with pin put in wrong 
locationgood thing I checkedTomorrowI'll connect all of the grounds to a temp grounding point and then put some power to 
the panel and begin the configuration/checkouot process (Hopefullyif I don't blow something up 1st!))
All of the EFUIS/MFD RS 232 connections made
Page 1 of 1