Home | About Us  |Decisions | Construction Log | Photo Albums | Other Builder Web Sites | Misc Links

 
                                                      Section    Description                  Step/s        Date         Hours                 

                                                                   (click link for details)           
                                                         47-2   Spinner and Cowling           x-x          xx/xx/xx       x.xx

                                                         47-4 &5 Will James Cowl              ALL         02/03/07      5.00

                                                         47-6                                             1-6         02/05/07       6.00

                                                         47-6 fitting bottom cowl                   6           02/06/07       4.00

                                                         47-6b more fitting bottom cowl         6b         02/07/08       5.25

                                                         47-6c More of the same                  6c         02/08/07       2.75

                                                         47-6d Finished fitting the cowl         6d         02/09/07       3.25

                                                         47-6   horizonal hinges drilled         7-13       02/10/07       5.25  

                                                         47-8  Riveting hinges upper cowl    9-13       02/12/07       4.25

                                                         47-7&8 riveted all remainig hinges   ALL      02/14/07       6.50  

                                                         47-8a facilitate hinge pins               ALL      02/16/07       3.00 

                                                         47-8b 6 ply lay-up on fwd seam       ALL     02/17/07        2.00  

                                                         47-8c inlet rings floxed                   ALL      02/19/07       4.50   

                                                         47-8d Seperated & cleaned up        ALL     02/20/07       3.00   

                                                         47-8e Trued-up lower &  oil door      ALL     02/21/07       5.50

                                                         47-10 Glassed oil door retainer       ALL     02/22/07        3.00 

                                                         47-10                                           4-9      02/28/07        3.50   

                                                         47-11                                           1-7      03/02/07        5.50

                                                         47-12                                           1-4      03/03/07        4.00

                                                         47-12                                            4-7     03/05/07        5.00

                                                         47-Finishing step 1                          1      03/06/07        4.00

                                                         47-finishing step 2                           2      03/07/07        3.00

                                                         47-finishing step 3                           3      03/12/07        4.50

                                                         47-finishing step 4                           4      03/13/07        4.00

                                                         47-finishing step 5                           5      03/14/07        3.50

                                                         47-finishing step 6                           6      03/15/07        5.00

                                                         47-finishing step 7                           7      03/16/07        5.50

                                                         47-finishing step 8                           8      03/17/07        5.50

                                                         47-finishing step 9                           9      03/20/07        4.50

                                                         47-hinge-1                                    ALL    07/19/07        1.50
                                                                                                                         
                                                                                                                        

                                                                                                                              Total    122.25
   

 
                      
Quick Links

EMPENNAGE

Vertical Stabilizer

Rudder
Horizontal Stabilizer
Elevators
Tailcone
Empennage Attach
Empennage Fairings


WINGS

Main Spars
Wing Ribs
Rear Spars
Top Skins
Outboard Leading Edge
Stall Warning System
Fuel Tanks
Bottom Skins
Ailerons
Flaps
Aileron Activation
Wing Tip Installation


FUSELAGE

Mid Fuse Bulkheads
Mid Fuse Ribs and Skins
Firewall
Fwd Fuse ribs and Skins
Fuse Side Skins
Step Installation
Upper Fwd Fuse Assembly
Tailcone Attachment
Baggage Area
Baggage Door
Access Covers Floor Panels
Brake Lines
Fuel System
Rudder Pedals and Brakes
Control System
Flap System
Upper Fwd Fuse Installation
Rear Seat Backs
Cabin Cover
Wing Attachment

FINISHING