Construction Log Report
Report Created by KitLog Pro
Printed:
2/22/2007
 1:38:37PM
40406
40313 N Candlewyck Ln
Van's Aircraft
RV-10
Kit Manufacturer:
Kit Model:
Kit Serial Number:
Anthem, AZ 85086
Deems Davis
Owner City/State/Zip:
Owner Address:
Owner Name:
Manual Reference #
Category
Date
Partner
Hours 
2/22/2007
Spinner and Cowling
 3.00
Sec 47-10 step 1-3
Latte last night I mixed up some flox and pressed it into some of the holes caused by cleco's and some voids alsothere was an 
area on the lower fwd right bottom cowl lhinge that needed a little build-upThis Am sanded all of the filled areas flush and 
leveled the build-up area on the bottom cowlThen prepared the oil door for a retainer-lay-upAfter double checking the 
operation of the hidden hinge with everything clecoed in placeI places several plys of duct tape across the top of the upper cowl 
to hold the oil door flush while the lay-up is applied and curingthen turned the cowl over Sanded the perimeter of the door 
opening and then applied duct tape to the inside of the oil doortrimmed it with an exacto knife so that it only covered the door 
itselfPrepared a ply lay-up betwen two sheets of plastic filmsqueeged excess epoxy outtrimmed with roller cutter to 7.5sq
and applied it to the underside of the door openingAdded some peel ply.
 
We're off to take Grandma back home and to visit the kids school over the weekendbe back Mon pm.
7 ply aly-up applied
Duct tape applied to hold oil door flush during lay-up
Build-up on bottom fwd hinge seam
Page 1 of 1