Construction Log Report
Report Created by KitLog Pro
Printed:
3/20/2007
 8:03:50PM
40406
40313 N Candlewyck Ln
Van's Aircraft
RV-10
Kit Manufacturer:
Kit Model:
Kit Serial Number:
Anthem, AZ 85086
Deems Davis
Owner City/State/Zip:
Owner Address:
Owner Name:
Manual Reference #
Category
Date
Partner
Hours 
3/19/2007
Spinner and Cowling
 4.50
Sec 47-finishing9
I know I said that I was finished wthe cowland I was,,,, but..... I needed to UV prime the oil door and final attach the Cam Loc'
(I wanted the metal washers to be flush with the surface and therefore recessed into the oir doorand that little detail added 
several hours of filling and sandingetcThen I needed to (but really didn't want toreattach the cowl and see/reassure myself 
that everything still fits properlyThat's another  hou or twoboy putting this cowl on and off is not a one person job and it takes 
much longer than I likeI have an idea about installing some alum brake line inside the cockpit that mich make the insertion of 
the horizontal hinge pins easierI also spent 30-45 mins on the scotchbrite wheel further tapering the upper right cowl hinge pin
it goes in better nowespecially with a little lubebut it's still VERY tightI think I'll work on both some morewith everythign fit 
togetherthere are a couple of areas thet need some detailingso I've made notes of those and put them on the 'To Dolist.
I taped on the spinner to get an idea of how it all 
looks Good I think!
oil door installed  & primed and afired even
Cowl reattached wthe nose gear close out cover 
installed
Page 1 of 1