Home | About Us  |Decisions | Construction Log | Photo Albums | Other Builder Web Sites | Misc Links

 
                                                      Section    Description                  Step/s        Date         Hours                 

                                                                   (click link for details)           
                                                     Interior-1                                          ALL          07/12/07     1.50

                                                     Interior 2                                          ALL          07/21/07     2.50

                                                     Interior-3                                          ALL          07/28/07     6.50

                                                     Interior-4                                          ALL          08/03/07     3.25

                                                     Interior-5   Headliner                          ALL         10/03/07      3.75

                                                     Interior-6   More Headliner                 ALL          10/04/07      4.50

                                                     Interior-7   Remove Headliner !           ALL          10/08/07      6.75

                                                     Interior-8   Fill & sand cabin cover      ALL          10/09/07      7.50

                                                     Interior-9   Finished filling rivet heads  ALL          10/11/07      4.25

                                                     Interior-10 Fabbed rear seat panels    ALL          10/12/07      6.00

                                                     Interior-11 Reprimed inside cabin       ALL          10/17/07      4.50

                                                     Interior-12 Sanded inside cabin          ALL          10/18/07      6.25

                                                     Interior-13 pinholes & reprime aft       ALL           10/19/07      4.75

                                                     Interior-14 masked and Painted         ALL           10/22/07      6.00

                                                     Interior-15 covered copilot door panel ALL            05/15/08     6.00

                                                     Interior-16 began covering pilot door   ALL           05/16/08      3.50

                                                     Interior-17 finished pilot door panel     ALL           05/17/08      1.50

                                                     Interior-18 Paint door interiors           ALL            05/20/08      3.00

                                                     Interior-19 Doors and Glareshield      ALL            05/22/08      6.25

                                                     Interior-20 Carpet                            ALL             03/28/09     13.00

                                                     Interior-21 Carpet                            ALL             03/30/09       2.00

                                                     Interior-22 Side panels start             ALL             04/02/09       5.00

                                                     Interior-23 side panel finish & seats  ALL             04/03/09       3.00

                                                                                                         
                                                                                                                        

                                                                                                                              Total     111.25
                        
Quick Links

EMPENNAGE

Vertical Stabilizer

Rudder
Horizontal Stabilizer
Elevators
Tailcone
Empennage Attach
Empennage Fairings


WINGS

Main Spars
Wing Ribs
Rear Spars
Top Skins
Outboard Leading Edge
Stall Warning System
Fuel Tanks
Bottom Skins
Ailerons
Flaps
Aileron Activation
Wing Tip Installation


FUSELAGE

Mid Fuse Bulkheads
Mid Fuse Ribs and Skins
Firewall
Fwd Fuse ribs and Skins
Fuse Side Skins
Step Installation
Upper Fwd Fuse Assembly
Tailcone Attachment
Baggage Area
Baggage Door
Access Covers Floor Panels
Brake Lines
Fuel System
Rudder Pedals and Brakes
Control System
Flap System
Upper Fwd Fuse Installation
Rear Seat Backs
Cabin Cover
Wing Attachment

FINISHING