Construction Log Report
Report Created by KitLog Pro
Printed:
10/10/2007
 9:11:58PM
40406
40313 N Candlewyck Ln
Van's Aircraft
RV-10
Kit Manufacturer:
Kit Model:
Kit Serial Number:
Anthem, AZ 85086
Deems Davis
Owner City/State/Zip:
Owner Address:
Owner Name:
Manual Reference #
Category
Date
Partner
Hours 
10/10/2007
Interior
 7.50
Sec Interior-8
Combo update for Tues WedInbetween waiting for the SuperFil layers to cureI removed soem tywraps in the engine 
compartment that were tied around the engine mount and replaced them wAdel clampsAlso secured some of the control 
cablesI've got a couiple more to do and then everything will be buttoned upMeanwhilethe major activity has been getting the 
cabin cover inside ready for paintThere are some 'Jogglesin the cabin cover around the window and around the aft borders
want the painted surfaces which wont be covered by upholstery panels to be smoothso that meand I have to fill the low spots 
with SuperFil and then sandfillsandfill ..... I also decided the cover all of the rivetheads on the longerons where the cabin 
cover attachesTwo applications of SuperFil with sanding in betweenand then I'm finishing up with applications of Metal Glaze
I'm putting a rounded fillet at the bottom seam where the cabin cover meets the longeronI'ts a LOT of extra workbut when I'ts 
all primed and painted it should look outstanding and will provide a more tailored/finished interior appearance.
Front portion of aft cabin cover filled and sanded
@ coats of SuperFil applied
Adel clamps added to replace tywraps
Page 1 of 1