Home | About Us  |Decisions | Construction Log | Photo Albums | Other Builder Web Sites | Misc Links

 
                                                      Section    Description                  Step/s                 Date         Hours                 

                                                                   (click link for details)           
                                                       48-2;3;4  Gear & Wheel Fairings       ALL                 12/11/06       3.50

                                                       48-5L     Left Wheel fairing                1-5                  12/12/06       1.50

                                                       48-5R&48-6L&R                               ALL                 12/13/06       6.00

                                                       48-7    Left & right                            1-2                  12/14/06       4.75

                                                       48-7    Left & right Main Gear            3-5                  12/15/06       7.50

                                                       48-8 & 9 Left & right leg fairings        ALL                 12/16/06       5.50

                                                       48-10 & 11 Left & right intersection   ALL                  12/19/06      8.00

                                                       48-11 & 12  Final Drill and mount      ALL                  12/20/06      4.75

                                                       48-15 thru 17 Nose fairing                ALL                   12/30/06     4.75

                                                       48-18  Nose fairing drill 7 flox            1-5                    01/01/07     3.25

                                                       48-19 thru 48-21 Mount nose fairing  ALL                   01/02/07     7.00

                                                       48 finishing                                     ALL                   01/08/07     5.00

                                                       48 finishing2  2nd coat nose gear      ALL                   01/09/07     6.00

                                                       48 finishing3  Main gear 8 legs         ALL                    01/12/07     2.50

                                                       48-finishing4 Main gear & legs         ALL                     01/13/07    5.00

                                                       48-finishing5 More of the same        ALL                     01/15/07     4.00

                                                       48-finishing6 Prime some parts       ALL                     01/17/07     5.00

                                                       48-finishing7 More parts primed       ALL                    01/18/07     3.25
                                                      
                                                       48-finishing8 sanding and priming    ALL                     01/24/07    3.00

                                                       48-finishing9 more priming/sanding  ALL                    01/25/07     7.00

                                                       48-finishing10 final prime/sand        ALL                     01/26/07     6.00

                                                       48-finishing11                                ALL                     03/05/07     3.00

                                                       48-finishing12                                ALL                     03/06/07     4.00

                                                       48-finishing 13                               ALL                     03/07/07     3.00

                                                       48-finishing 14                               ALL                     03/12/07     4.50

                                                       48-finishing 15                               ALL                     0313/07      3.00

                                                        48-finishing 16                              ALL                     03/14/07     3.00

                                                                                                                        

                                                                                                                                   Total         123.75
                        
Quick Links

EMPENNAGE

Vertical Stabilizer

Rudder
Horizontal Stabilizer
Elevators
Tailcone
Empennage Attach
Empennage Fairings


WINGS

Main Spars
Wing Ribs
Rear Spars
Top Skins
Outboard Leading Edge
Stall Warning System
Fuel Tanks
Bottom Skins
Ailerons
Flaps
Aileron Activation
Wing Tip Installation


FUSELAGE

Mid Fuse Bulkheads
Mid Fuse Ribs and Skins
Firewall
Fwd Fuse ribs and Skins
Fuse Side Skins
Step Installation
Upper Fwd Fuse Assembly
Tailcone Attachment
Baggage Area
Baggage Door
Access Covers Floor Panels
Brake Lines
Fuel System
Rudder Pedals and Brakes
Control System
Flap System
Upper Fwd Fuse Installation
Rear Seat Backs
Cabin Cover
Wing Attachment

FINISHING