Construction Log Report
Report Created by KitLog Pro
Printed:
9/9/2008
10:41:21PM
40406
40313 N Candlewyck Ln
Van's Aircraft
RV-10
Kit Manufacturer:
Kit Model:
Kit Serial Number:
Anthem, AZ 85086
Deems Davis
Owner City/State/Zip:
Owner Address:
Owner Name:
Manual Reference #
Category
Date
Partner
Hours 
9/06/2008
Painting
 25.00
Rob Drew
Sec Paint-5
Another update. Rob  got the bae colors applied to the wings and to the wheel fairings. He should be able to get the wings 
cleared this week and back to the hangar shortly thereafter. Hopefully things are moving a little faster. I made a visit to his shop 
yesterday , The Fuse and the rest of the empannage are fully prepped and ready to have color applied to them, as well. I did 
notice that the pop rivets in the leading edge had not been filled before paint, and that some how I missed bucking a rivet in the 
bottom of the left wing, we'll put a pop rivet it and fill it. rob will fix both of these before clearing the wings. while all of this is going 
on, I'm trying to get things moved from the garage to the hangar and get the hangar set up so I can complete the few remaining 
tasks and do final assembly.
Wings with colors applied
Wheel pants getting base coat colors
Wingtips with base coat color
Page 1 of 1