Construction Log Report
Report Created by KitLog Pro
Printed:
6/25/2008
 7:51:42PM
40406
40313 N Candlewyck Ln
Van's Aircraft
RV-10
Kit Manufacturer:
Kit Model:
Kit Serial Number:
Anthem, AZ 85086
Deems Davis
Owner City/State/Zip:
Owner Address:
Owner Name:
Manual Reference #
Category
Date
Partner
Hours 
6/25/2008
Home Stretch
 4.50
Sec Home-74
I decided that I would add a modification I learned about from Robin MarksIt's an access door through the aft baggage 
bulkheadParticularly useful to refill the Obottleand to service the batteriesThe 1st step was to cut out the opening being 
carefullas the piece that is left needs to act as the door itselfI used the air grinder and a cutoff wheelTo make some 'door 
jamsI used one of the seat backs that came with the kitI didn't use theseat back themselves because the Clasic Areo rear 
seats use their own framesI cut 1 1/2wide strips from one of the seatback panels and match drilled them to the sides of the 
doorleaving about 5/8exposed into the door openingI used a 3/4piece of 1/8flat alum across the topand then a 1piano 
hinge across the bottom.  After trueing up the door edgesand the door openingI dimpledprimed and then riveted the door 
'jamsin placeI added two "Jchannel stiffeners to the center of the door to provide some stiffness to the doorI picked up 
some camloc type fastners from Aerozona on TuesI'm going to use them to close the doorInitiallyI'm going to try and use just 
2one in each of the upper cornersI may need to add midway down the door if it doesn't secure it enoughits been MUCHO 
hot here latelyso progress on anything is SLOWMy painter called yesterday and he's good to go on picking up my plane late 
next week for paint WHOOHOO!! Still waiting on the rudder pedals from Paul G to arrive.
Camloc fasteners.
Door with J channel stiffeners
Aft baggage bulkhead access door cut drilled and 
clecoed
Page 1 of 1