Construction Log Report
Report Created by KitLog Pro
Printed:
4/2/2008
 6:58:08PM
40406
40313 N Candlewyck Ln
Van's Aircraft
RV-10
Kit Manufacturer:
Kit Model:
Kit Serial Number:
Anthem, AZ 85086
Deems Davis
Owner City/State/Zip:
Owner Address:
Owner Name:
Manual Reference #
Category
Date
Partner
Hours 
4/02/2008
Home Stretch
 3.50
Sec Home-50
Apart for reassembling everything to double check fitI finished the empennage fairing todayI also believe that I've 
driven/squeezed my last rivet on this planeI did have to take the Vertical stab off in order to get the nutplates drilled ,dimpled 
and installed on the HorizontalWhile off I also did the same for those nutplate that attach to the VertAdditionallyI installed the 
nutplate that go on the tailcone aft upper skinAfter all of that I had to remove the Horizontal in order to drilland tapand finish 
the close out cover for the bottom of the fairingI had noticed that after trimming the fiberglass fairing to meet the closeout piece 
that it is possible for the close out to 'bowoutboard from the fuse sideand present a 'gapthat's a drag and water producer 
potentialSo While I was prepping the closeoutsI riveted a small tab of '032to the fron tof eachThis tabl will fit behind the 
fiberglass fairing at the bottom and will keep the closeout and the rubber from pulling away from the fuse and moving outboard
Drilled all of the longeron/skin attach holes with 7/64 (didn't have a "36and then tapped them with a 6-32 tapSeems to have 
worked wellI think I'll use some Blue locktite when installing these for final assembly.,
Bottom close out covernote the 'tabat the fron to 
keep it from migrating outboard.
Nutplates attached to Vert Stab.
#Nutplates drilled,dimpled,deburredand riveted to 
Horiz Stab
Page 1 of 1