Construction Log Report
Report Created by KitLog Pro
Printed:
12/3/2007
 6:52:26PM
40406
40313 N Candlewyck Ln
Van's Aircraft
RV-10
Kit Manufacturer:
Kit Model:
Kit Serial Number:
Anthem, AZ 85086
Deems Davis
Owner City/State/Zip:
Owner Address:
Owner Name:
Manual Reference #
Category
Date
Partner
Hours 
12/03/2007
Home Stretch
 5.25
Judy
Sec Home-32
Finishe up mounting the O2 bottle today. Cut a piece of .090" (it's all I had available). so that the inboard edge was flush with the 
inboard angle, and the outboard edge was aprox 1 1/4" inboard of the outside skin. I then removed the angle from the inboard 
support and match drilled it #19 to the base. I installed #8 nutplates on the angle and countersunk the top of the base. I 
remounted it into the fuse, with the angle for the outboard support clecoed aprox in place. With the base screwed to the inboard 
supports. I moved the outboard angle until it was flush with the outboard support. then removed the base and match drilled #19 
the outboard angle and base. intalled #8 nutplated on the angle and countersunk the base for #8 screws. I fabbed some 
supports out of alum angle and flatstock to be riveted to the J channel to provide the vertical support. The lower support was 
made with 3/4" angle the upper used 1 1/2" because  the fuse sides are not perpendicuar to the base. After the vertical support 
brackets were fabbed I temp attached then to the bottle and set the bottle in place on the base, and marked each vertical 
support bracket where it contacted its respective J channel. removed everything , primed the vertical supports and then match 
drilled #30 them to the J channel and used LP4's to secure them in place. Primed the base and w/ judy's help riveted the 
supports to the botom of the fuse. Installed the base using 6 #8 screws and then secured the clamps for the vertical support!
O2 bottle secured
O2 bottle base plate installed w/ #8 screws
O2 base support brackets ready for riveting to bottom 
Fuse
Page 1 of 1