Construction Log Report
Report Created by KitLog Pro
Printed:
7/6/2007
 6:26:17PM
40406
40313 N Candlewyck Ln
Van's Aircraft
RV-10
Kit Manufacturer:
Kit Model:
Kit Serial Number:
Anthem, AZ 85086
Deems Davis
Owner City/State/Zip:
Owner Address:
Owner Name:
Manual Reference #
Category
Date
Partner
Hours 
7/06/2007
Firewall Forward
 5.50
Sec FFPS-9
Finished up attaching the #&welding cables to the Starter and AlternatorI used more adel clamps near the starter contactor 
to keep the cables clear of the future Oil cooler scat tube connectionI ran the starter cable down the 'tunnelusing some 
brackets I made with adel clamps on one end and the other attached to the sump boltsI makes a pretty neat/tidy installation
ran the #cable for the alternator under the engine mountI used ty-wraps instead of more adel clampsand ty-wraped the #
cable to the curved lower cross member that runs beneath the oil sumpI tied it off to the vertical engine mount on the rigth side 
using adel clampsand then brought it forward through the right side tunnelin the same fashion as the Starter cableWhen I 
started this engine system installationI was worried about all of the maze of wirescableshyd linescontrolsetcand I couldn'
quite see a way to sort it outBut with only a couple more wires Alt Field wires and B lead for SD-20Starter contactor switch 
wireand the controls left I think it's coming together OKI need to get the panel to a point where I canpsint the sub-panels that 
hold the control cables so that I can mount the control linkages and then be pretty much finished with the Engine installBegan 
countersinking the sub-panel mounting screw holesI'm going to uses stainless steel #screws sto attach theseUsed the 
Scotchbrite wheel to smooth the subpanel edges so that they won't mare the paint when being installed and removed.
Sub-panel countersunk and edges scotchbrited
#welding cable attached to 60 A alt and secured to 
sump bolt brackets
#welding cable attached to starter and secured to 
sump bolt brackets
Page 1 of 1