Construction Log Report
Report Created by KitLog Pro
Printed:
6/15/2007
 4:31:05PM
40406
40313 N Candlewyck Ln
Van's Aircraft
RV-10
Kit Manufacturer:
Kit Model:
Kit Serial Number:
Anthem, AZ 85086
Deems Davis
Owner City/State/Zip:
Owner Address:
Owner Name:
Manual Reference #
Category
Date
Partner
Hours 
6/15/2007
Firewall Forward
 2.00
Sec FF2-plenum12
Finished riveting the portions of the #& # rear baffles togetherAlso riveted the oil cooled duct attach ring to the back of #
using flush rivetsI added additional rivets in between the Van's depicted rivetsSeems to make the attachment sit flusher to the 
baffleI left the top rivet hole openI'll dirll it out for a #Screw and put a nutplate on the plenum for a tighter seal in this area
also drilled and affached the Secure cable safe hardware I received from ACSThis will be where the fuel purge return control 
line connects through the plenum/baffleI though tI would have to remove the Upper Left engine mountin order to geth the 
riveted #Baffle off and back onbut with a little 'encouragementit made it.
#6 Baffle final riveted
Cable Safe fitting attached for fuel purge valve cable
#5 Baffle riveted and final attached
Page 1 of 1