Construction Log Report
Report Created by KitLog Pro
Printed:
1/19/2007
 6:03:43PM
40406
40313 N Candlewyck Ln
Van's Aircraft
RV-10
Kit Manufacturer:
Kit Model:
Kit Serial Number:
Anthem, AZ 85086
Deems Davis
Owner City/State/Zip:
Owner Address:
Owner Name:
Manual Reference #
Category
Date
Partner
Hours 
1/19/2007
Firewall Forward
 5.00
John Ackerman
Sec FF1-5
WellIT finally happenedTHE ENGINE GOT HUNG!!!!! HORAYbut even today had it's challengesBefore remounting the 
engine mountWe needed to add an eyeball firewall passthrough for the fuel purge valve return line.  Then we remounted the 
engine mount only to find that the original placement I had for the purge valve return line was interferring with the engine mount
So foo came the mountand we relocated the purge return line. (See picand put a plug in the old hole and sealed it with a bolt 
and washers and PermatexBack on with the engine mount only to discover that some bolt heads I used to plug holes that I 
drilled for a shunt that was interferring ALSO interferredOFF with the mount againreplaced the bolts with countersunk screws
permatex and washersback On with the mountNO INTERFERRENCE THIS TIME!!!! Back ON with the nose gearand then at 
long last THE HANGING!!!! took placeMoved the hoisted engine up close and personal and John Ackerman who helped all 
dayand I got the lower mounts,spacers,bolts,washers and nuts onthen tried the topbut we were a little too highso we 
loosened the lower assembliesdroped the engine a smidgeand then were able to pull the upper ones by wrenching them in
Got everything cinched down and torquedthen stood back and enjoyed the momentOur EAA chapter is having a project day 
tomorrow at my home so I need to clean things up a bit!
Enjoying the moment
Fuel supply line (upperand purge return line (lower
with new positioning
Engine mount back on for the LAST time!
Page 1 of 1