Construction Log Report
Report Created by KitLog Pro
Printed:
12/19/2006
 7:05:54PM
40406
40313 N Candlewyck Ln
Van's Aircraft
RV-10
Kit Manufacturer:
Kit Model:
Kit Serial Number:
Anthem, AZ 85086
Deems Davis
Owner City/State/Zip:
Owner Address:
Owner Name:
Manual Reference #
Category
Date
Partner
Hours 
12/19/2006
Gear & Wheel Fairing
 8.00
Sec 48-10 & 48-11
Working on the gear intersection fairings. 1st off the plans instructions for locating point B on the gear leg fairing are just plain 
wrong. I finally figured out that the line they want to establish is a line that is parallel to the fuse axis, and through a series of trial 
and error, using the plumb bob, I was able to estabish a point on the step and the forward edge of the gear leg where both X & Y 
dimensions were equal AND the line between point A & B was level w/ the Fuse. the plans indicate that the lay-ups should be 
done on  the legs - wet. !st off I used a haet gun to bend the original 2 play lay-up to fit snuggly against the pants. then I removed 
them and did the lay-ups on the bench, waited until the fiberglass was beginning to set up, then trimmed the excess 'flash' and 
placed them on the gear legs, with clecos and spring clamps to hold them tightly in place. Then I put the Halogen lights on them 
overnight to let them cure well and take their final set. Seems to have worked pretty well. Only now I've got another composite 
filling.sanding, finishing project to get these into final shape. I want to get them at least trimmed to teir final size and initial 
sanded before drilling for the nutplates.
The Right leg fairings set for their overnight cure.
one of the intersection fairings geting an additional 3 
play (6 oz) lay-up
Left gear fairings curing
Page 1 of 1