Construction Log Report
Report Created by KitLog Pro
Printed:
12/6/2006
 6:25:15PM
40406
40313 N Candlewyck Ln
Van's Aircraft
RV-10
Kit Manufacturer:
Kit Model:
Kit Serial Number:
Anthem, AZ 85086
Deems Davis
Owner City/State/Zip:
Owner Address:
Owner Name:
Manual Reference #
Category
Date
Partner
Hours 
12/06/2006
Cabin Doors & Window
 5.00
Sec 45 finishing2
Milestone todayI finished the doors! (at least for now). Sanded the 2nd coat of Smooth Prime this morningGot most of the 
pinholesThen shot a final coat on both doorssanded that w220 gritand it looks GREATThere are probably about 15 
pinholes left on both doorsthat I'll fill and sand manually befor paintbut for now these are going into storageand i'm moving on 
with the projectBUT before moving too farI needed to clean up the garage/shopIt'a been an unmitigated disaster these past 
couple of weeks with all ofthe dust flying aroundWellafter several hours of vacumingAir hosingand wiping I think I got most 
of itfunny how a clean shop and a clean project/plane can have such a postitive change in your attitude.
Christmas is coming early for MeI got some pictures of my Engine from Allen Barrett BPEIt is shipping tomottow and 
should be here next week!!!!!!
BPS IO-540-X
BPE Cold Air Induction
Door finished (for now)
Page 1 of 1