Construction Log Report
Report Created by KitLog Pro
Printed:
12/6/2006
 6:25:15PM
40406
40313 N Candlewyck Ln
Van's Aircraft
RV-10
Kit Manufacturer:
Kit Model:
Kit Serial Number:
Anthem, AZ 85086
Deems Davis
Owner City/State/Zip:
Owner Address:
Owner Name:
Manual Reference #
Category
Date
Partner
Hours 
12/06/2006
Cabin Doors & Window
 5.00
Sec 45 finishing2
Milestone today! I finished the doors! (at least for now). Sanded the 2nd coat of Smooth Prime this morning, Got most of the 
pinholes, Then shot a final coat on both doors. sanded that w/ 220 grit, and it looks GREAT! There are probably about 15 
pinholes left on both doors, that I'll fill and sand manually befor paint, but for now these are going into storage, and i'm moving on 
with the project. BUT before moving too far. I needed to clean up the garage/shop. It'a been an unmitigated disaster these past 
couple of weeks with all ofthe dust flying around. Well. after several hours of vacuming. Air hosing, and wiping I think I got most 
of it, funny how a clean shop and a clean project/plane can have such a postitive change in your attitude.
Christmas is coming early for Me! I got some pictures of my Engine from Allen Barrett @ BPE, It is shipping tomottow and 
should be here next week!!!!!!
BPS IO-540-X
BPE Cold Air Induction
Door finished (for now)
Page 1 of 1