Construction Log Report
Report Created by KitLog Pro
Printed:
12/1/2006
 4:34:42PM
40406
40313 N Candlewyck Ln
Van's Aircraft
RV-10
Kit Manufacturer:
Kit Model:
Kit Serial Number:
Anthem, AZ 85086
Deems Davis
Owner City/State/Zip:
Owner Address:
Owner Name:
Manual Reference #
Category
Date
Partner
Hours 
12/01/2006
Cabin Doors & Window
 3.00
Sec 45-doorgap8
Same old storyfillingcuringsanding... repeat.... It is getting close to the end of the Flox/Fill esisodesI think i've got enough 
of a build-up on both doors to get them flush with the Fuse sideswithout body fillerAfter sanding flush tomorrow,  there are a 
couple of spots where the gap is a little too big for nowso a little more filler there and then I think that part is doneThe next 
step is to remove the doors (againand fill then with SuperFilsand them and then shoot themwith Smooth Prime and final 
sand thenthe right door will need a repair where I cut the handle too bigThen I think I'll also prepare the Cabin coverto get 
ready for paint (I'm not close to paintingI want to get as much of this Major sanding and filling out of the way before the engine 
arrivesI've still got some repari work to do on the inside of the doorsbut haven't decided if I want to do it now,  or when I install 
the interiorheadliner and side panelsThe Super Fil over the Flox on the Cabin/Fuse seam worked greatIt sands NICE!!!!
applied a couple of touch up spots which need to be sanded out and blendedthen I'll re-prime that area.
A Little touch up on the Cabin/Fuse seam
Ditto the right door
Left door Bottom edge filled (build-up) and curing
Page 1 of 1