Construction Log Report
Report Created by KitLog Pro
Printed:
11/25/2006
 2:34:42PM
40406
40313 N Candlewyck Ln
Van's Aircraft
RV-10
Kit Manufacturer:
Kit Model:
Kit Serial Number:
Anthem, AZ 85086
Deems Davis
Owner City/State/Zip:
Owner Address:
Owner Name:
Manual Reference #
Category
Date
Partner
Hours 
11/25/2006
Cabin Doors & Window
 2.50
Sec 45-doorgap3
More of the samedid the initial sanding of the Left doorthen removed the doorthis door sits lower than the cabin top in a 
couple of places so it's going to require several tape/fill/sand cycles to get them booth at the same level and smoothAfter the 
initial sand I mixed up the goop and applied to the cabin areas that needed some build-uphave a couple pf places on the right 
door (not shownwhere I also did smoe minor build-up's after they are cured that should do it for the Right door frame portionIf 
this sits up hard enough tonight I might be able to get another sanding done on it and then get another build-up applied so it can 
cure/harden on SundayWe'll see.
Left door forward door post
Building up some low areas on the cabin top
Applied 2nd coat to build-up some low areas
Page 1 of 1