Construction Log Report
Report Created by KitLog Pro
Printed:
11/24/2006
 5:14:49PM
40406
40313 N Candlewyck Ln
Van's Aircraft
RV-10
Kit Manufacturer:
Kit Model:
Kit Serial Number:
Anthem, AZ 85086
Deems Davis
Owner City/State/Zip:
Owner Address:
Owner Name:
Manual Reference #
Category
Date
Partner
Hours 
11/24/2006
Cabin Doors & Window
 3.00
Sec 45-doorgapl&r
Sanded the right door on the interior of the seam/gap so that I could go back and fill the irregular edges from the 'squeege' 
effect. Then mixed some more 'goop' and troweled it into the low spots on the inside of the door seam and a few of the other 
spots on the exterior. Then prepared the Left door, by sanding all of the interior edges, applying clear packing tape to all of the 
door edges, rebolted the Left door back on the fuse after temporarily putting screws in to hold the Cabin cover frame to the fuse. 
Mixed up the Goop and squeeged it into the gaps. On the Left door, there are more places where the door is lower than the 
Cabin cover, and so it will require taping the Cabin cover and applying Goop to the door after the Cabin cover edged are built up. 
It;s just going to take several back and forth sessions, until it's built up appropriately. After the majority of the edges are built-up. I 
may be able to use some filler for the remainder. I'm going to hold off on putting the final edge on both of the doors until I've got 
all of the 'body work' done.
Left door Top edge
Left door forward edge
Right Door beginning to get into shape
Page 1 of 1