Yesterday and today was spent finishing up items assoc w/ the Right wing install. there were several nutplates that needed to be |
|
added to the forward "D" section if the inboard furl tank. And Those were riveted on with the wings in the cradle. The final step |
|
was to prime the root fairing support brackect and the fuse side skins and attach nutplates to the brackets and then rivet them on |
|
to the fuse. Again a combo os CS4-4, LP4-3's and AN470 4-4&5's. Tomorrow, I'm going to remount the wing tips and the |
|
ailerons to insure I've got enough clearance considering the filling I did with the wing tips. and then the wings are ready for paint. |
|