This is actually work over the past 3 days. And it amounts to finishing up some items in Sec 44 for the left wing attachment. |
|
Including riveting the fuel tank support brace to the support (AN4704's) and then attaching countersunk #8 nutplates to the |
|
forward section inf the Left wing skins to attach the root fairings. As most things go this took a bit more time than I expected, |
|
partly because the wing is sitting in the cradle and I don't have any body to help, so I had to work in the limited space. Then after |
|
priming all of the parts. I attached the inboard fairing support flanges to the fuse. I didn't read the plans carefully enough and had |
|
to remove some of the nutplates in order to get either the pop rivet or rivet gun in place. These braces used 470 4's, CS 4's, and |
|
LP4's, quite a combo of rivets. The only things remaining on the left wing are to route the electrical wired from the cockpit |
|
througha gromet/snap bushing for the wing. And to fabricate a Fuel vent tube and the fuel line from the left wing tank to the fuel |
|
valve. As soon as I can get some help I'll mount the right wing and then try and get the wings finished up and on to the paint |
|
|