Construction Log Report
Report Created by KitLog Pro
Printed:
7/24/2006
 6:34:39PM
40406
40313 N Candlewyck Ln
Van's Aircraft
RV-10
Kit Manufacturer:
Kit Model:
Kit Serial Number:
Anthem, AZ 85086
Deems Davis
Owner City/State/Zip:
Owner Address:
Owner Name:
Manual Reference #
Category
Date
Partner
Hours 
7/24/2006
Miscellaneous
 2.50
Sec 43.5
I've had a brealk for several weeks,
A. my son returned home from 2 years in UK and it's been nice getting reacquainted. 
B. It's been hotter than !@#$ here ( 115-118!!) and just too hot to be in the garage.
I've spent a lot of time the past couple of weeks in planning my panel and electrical system. I'm going w the Z14 dual 
alternator/dual battery from Aero Electric connection. I've ordered all of the radios, EFIS, Alternator, switchs and other stuff to get 
the wiring done. It shouls all arrive this week! Meanwhile Patrick and I temporarily installed the HS and elevators to see if I would 
have a problem with the CH control grips when it hit the elevator stops. Turns out that I still have an interference problem with 
the panel. the upright portion of the grip needs to be rotated back (aft) about 20-22 degrees so that the top of the GH grips will 
clear the panel. So Today, I cut off the metal grip handle, and cround/filed the control stick to provide the 20 degree angle, then I 
took them to Bill who TIG welded them, they turned out nice, he only wanted 10$, but it was worth at lest 20$ to me!. Got them 
home and cleaned up the bottoms to look a little more streamlined. With the bottoms cut on an angle, I think I can drill/grind a 
nole in the curved portion so that I don't have to drill a hole from the rear. We'll see/ One more day and Pat an I leave for OSH!!
Cleaned up a bit
Returned from welderes
Both sticks filed/ground to 20 degrees aft angle
Page 1 of 1