Installed the flap system and the flap positioning system today. Once again I didn't think this would take as long as it did, but the |
|
heat and working within the confines of the tunnel conspired to add to the length of time. Nothing remarkable here, pretty straight |
|
forward in the plans, Sanding the Delrin block took longer than I thought, I guess that's a good thing (they won't wear easily). I |
|
still need to mount the positioning system control module (tomorrow?). Look slike I'll probably install it inside of the tunnel, as it's |
|
hard wired to the positioning rings that are attached to the motor/screw |
|