Construction Log Report
Report Created by KitLog Pro
Printed:
6/3/2006
 2:53:44PM
40406
40313 N Candlewyck Ln
Van's Aircraft
RV-10
Kit Manufacturer:
Kit Model:
Kit Serial Number:
Anthem, AZ 85086
Deems Davis
Owner City/State/Zip:
Owner Address:
Owner Name:
Manual Reference #
Category
Date
Partner
Hours 
6/03/2006
Control System
 8.00
Sec 39-5 thru 39-8
Made a major dent in the control system installNothing remarkablethe thing which took the most time was positioning the 
washers on either side of the rod ends inbetween the weldmentsTakes some fannagling and some patience.  I redid the initial 
installation of the Left control stick basethe weldment is too narrow for the brass bushingand initially I tried to spread the 
flanges on the weldmenthowever when torquedthey bind a bit and cause friction in the controlsTh eplans tell you that it may 
be necessary to adjust the length of the bushing and the pivot tubeI did the Right by shortening the brass bushing to the correct 
length and then shortening the pivot tubeand the whole thing went in much smootherI did put some washers in to take up the 
slack,  The result is a friction free installation with no slop/play.
All hooked up (except the elevatorto !@#$ hot to 
continue today (110!)
Redid the control stick base install to eliminate friction
The 'lightwashers installed took a bunch of time and 
the O'l man had to wiggle into the tailcone
Page 1 of 1