Connected the last of the control system linkages. The small pushrod w/ the safety wire. You clamp the elevator bellcrank in the |
|
neutral position using the template made in Sec 11-7 and then using another temporary spacer built per the plans validate that |
|
the control sticks are in the 'neutral position. Once again, everything looked spot on using the dmiensions from the plans and no |
|
further adjustment of the rod ends and jam nuts was required. |
|