5/19/2006
Baggage Door
 4.25
Sec 34-3&4&5
The door locks, and ignition switch/key's arrived today, so back to finish up the Bagage door. Deburr all the holes and edges, 
Prime all parts. Cut the hinge and match drilled, deburred, and countersink, then rivet to the fwd brace. Then rivet the braces to 
the outside skin and to each other. I 'back riveted them, but instead of using the back rivet set (not enough room) I used the long 
handled bucking bar, that has a pretty long foot on one end, That and a 2 1/2 lb sledge, and 3 whacks later = a set rivet. Took a 
little longer, but it's the only way I could figure to get it all riveted. Worked out fine, there were two rivets that were a little high, 
dressed them with the Vixen file and on we go. Installed soundproofing, installed the lock and then pop riveted that inside skin. 
Started on the attach to the fuse, but it's too hot, that will have to wait til Monday. Tomorrow  & sun I'm going to the Nuckols 
wiring seminar in Prescott
Finished product w/ Lock
Primed,riveted and soundproofed
Assembly clecoed w/ hinge