REceived the F1024 L&R rear seat pans so went back and completed Sec 33-2 steps 1-4. The rest of today was a lot of match |
|
drilling, deburring, dimpling, Looking back doesn't look llike much progress, but this is a lot like skinning a wing, there are a ton o |
|
fholes in skins and ribs that all have to be drilled, dimpled, deburred. i've also scotchbrited everything so the parts are pretty |
|
much ready for prime. The Com antennas are suppose to arrive on Monday, and they need to be installed befor the baggage |
|
floors get riveted down, I'm guessing that will be Next Tues. |
|