Construction Log Report
Report Created by KitLog Pro
Printed:
5/1/2006
 6:38:02PM
40406
40313 N Candlewyck Ln
Van's Aircraft
RV-10
Kit Manufacturer:
Kit Model:
Kit Serial Number:
Anthem, AZ 85086
Deems Davis
Owner City/State/Zip:
Owner Address:
Owner Name:
Manual Reference #
Category
Date
Partner
Hours 
5/01/2006
Tailcone Attach
 3.25
Sec 32-2 & 32-3
Started on the Tailcone attach, I've been down with a whopper of a cold for the past week and 1/2. Didn't even want to work on 
the plane for several days. Think I've got it licked today. I've been a little intimidated about this section, as it is sort of a mojor 
event, and I expected some difficulty in alligning everything, Well it was much ado about nothing. Once again the match hole 
technology proves it's self, and although the major assemblies are built independently, miraculously ALL of the holes line-up. I 
helped Andrew Rayhall join his fuse and tailcone last week, And learned that as long as you have the 2 sections properly aligned 
they go together fairly easily. I built a QED support out of some scrap lumber to support the forward end, and then shimmed both 
ends to get the proper angle and height the rest was easy. (well mostly)
The tow longerons matchdrilled and bolted
Baggage door view
WOW this is starting to look lke an airplane
Page 1 of 1