Finally figured out that I DID have a tool which would cut the old elevator bucking bar. Its a high speed grinder/cut offwheel. 20 |
|
minutes use of it and I had 2 new bucking bars (and the knowledge and material to make any additional that I might need down |
|
the road. Another 30 minutes per fuse side and I had the F1041 Longerons and doublers and nutplates finished. Now to put |
|
down some soundproofing, install the floor pans, reinstall the geatr mounts and rivet the F1088 ribs and Sec 29 will be history! |
|