Construction Log Report
Report Created by KitLog Pro
Printed:
4/12/2006
 9:16:16PM
40406
40313 N Candlewyck Ln
Van's Aircraft
RV-10
Kit Manufacturer:
Kit Model:
Kit Serial Number:
Anthem, AZ 85086
Deems Davis
Owner City/State/Zip:
Owner Address:
Owner Name:
Manual Reference #
Category
Date
Partner
Hours 
4/12/2006
Fuse Side Skins
 6.50
Sec 29-16
Yesterday was spent doing taxes, or rather avoiding taxes, For the 1st time, I am paying No Fed or State income tax, zip, zero, 
nada!!!   Well, back to airplane building, Reassembled and riveted together all of the Fude understructure, Additionally, I 
replaced the WD-1002L weldment, the top flange ended up being too close to the edge and it worried me, Called Van's and had 
them send a replacement, I drilled the old one off, and re-riveted the new one on, It actually went quicker than I thought, Then 
re-drilled the top, bottom and side flanges, only this time I put a clamp on the top and bottom to bring them in closer to avoid 
getting close to the edge again, worked like a charm. I also made a modification to the Step attachment, based on a note I saw 
on Matronics about someone noticing the the steps seems 'loose and with too much give in them. It consisted of taking the 
outboard baggage ribs off and drilling out the fwd and aft most rivets that attach the plate to the rib, and then fashioning, some J 
stiffeners, priming them and then re-riveting them and the attach bracket to the ribs, I don't know if it will help, but it certaintly 
won't hurt. The last item on this page is to re-cleco all of the skins back on the fude preparatory to riveting them,
L & R Fuse skins clecoed ready for riveting.
J stiffeners attached to the Step attach brackets, 
hope this helps
Here's the old weldment note how close to the edge 
some of the holes got,
Page 1 of 1