Construction Log Report
Report Created by KitLog Pro
Printed:
4/12/2006
 9:16:16PM
40406
40313 N Candlewyck Ln
Van's Aircraft
RV-10
Kit Manufacturer:
Kit Model:
Kit Serial Number:
Anthem, AZ 85086
Deems Davis
Owner City/State/Zip:
Owner Address:
Owner Name:
Manual Reference #
Category
Date
Partner
Hours 
4/12/2006
Fuse Side Skins
 6.50
Sec 29-16
Yesterday was spent doing taxesor rather avoiding taxesFor the 1st timeI am paying No Fed or State income taxzipzero
nada!!!   Wellback to airplane buildingReassembled and riveted together all of the Fude understructureAdditionally
replaced the WD-1002L weldmentthe top flange ended up being too close to the edge and it worried meCalled Van's and had 
them send a replacementI drilled the old one offand re-riveted the new one onIt actually went quicker than I thoughtThen 
re-drilled the topbottom and side flangesonly this time I put a clamp on the top and bottom to bring them in closer to avoid 
getting close to the edge againworked like a charmI also made a modification to the Step attachmentbased on a note I saw 
on Matronics about someone noticing the the steps seems 'loose and with too much give in themIt consisted of taking the 
outboard baggage ribs off and drilling out the fwd and aft most rivets that attach the plate to the riband then fashioningsome J 
stiffenerspriming them and then re-riveting them and the attach bracket to the ribsI don't know if it will helpbut it certaintly 
won't hurtThe last item on this page is to re-cleco all of the skins back on the fude preparatory to riveting them,
L & R Fuse skins clecoed ready for riveting.
J stiffeners attached to the Step attach brackets
hope this helps
Here's the old weldment note how close to the edge 
some of the holes got,
Page 1 of 1