Construction Log Report
Report Created by KitLog Pro
Printed
:
3/6/2006
7:30:37PM
40406
40313 N Candlewyck Ln
Van's Aircraft
RV-10
Kit Manufacturer
:
Kit Model
:
Kit Serial Number
:
Anthem, AZ 85086
Deems Davis
Owner City
/
State
/
Zip
:
Owner Address
:
Owner Name
:
Manual Reference
#
Category
Date
Partner
Hours
3/06/2006
Fwd Fuse Ribs & BHDS
2.40
Sec 28-5
Continue preparing parts for the Fwd fuse and bulkheads
.
Match driled the AN
3
bolts holes on the control colimn assembly
.
Match drilled the remaining AN
3
bolt holes on the F
1048
.
Clecoed the fwd fuse floor ribs to the fwd fuse bottom skin
.
Match drill
all
#
40
holes
Match drill everything in this section
Add more parts for match drilling
Match drill the control column mounts to each side
Page 1 of 1