Construction Log Report
Report Created by KitLog Pro
Printed:
2/28/2006
 6:47:46PM
40406
40313 N Candlewyck Ln
Van's Aircraft
RV-10
Kit Manufacturer:
Kit Model:
Kit Serial Number:
Anthem, AZ 85086
Deems Davis
Owner City/State/Zip:
Owner Address:
Owner Name:
Manual Reference #
Category
Date
Partner
Hours 
2/28/2006
Firewall
 5.75
Sec 27-2
Primed all of the parts that attach to the Fuselage, then bagan the riveting process. I was able to squeeze some of them across 
the bottom stiffener, but the rest required back riveting, For some reason, I had some difficulty getting the rivets to sit flush, I 
ended up drilling out several, i finally found out that the problem was that I wasn't being carefule enough with the rest of the 
structure, anbd clecos, ot the firewall flange were binding of causing some torque so that the parts didn't lay , flat, afte drilling out 
way too many rivets, I finally, slowed down and checked to make sure that there wasn't anything bostruction the flush set 
between the part and the back rivet plate, and things went much better. Also this is an area where the SMALL back rivet plate 
works much better than the large one, I Also found the despite having to turn the firewall back and forth loading & taping rivets 
then back riveting, it worked much better to only work a small area (4-6 rivets) at a time. This ended up taking longer than I 
planned, but that seems to be the story of my build. Oh well.... the next project will go quicker!!!!!
Close ups of upper left forward side
Finished product
Parts Primed