Construction Log Report
Report Created by KitLog Pro
Printed:
2/8/2006
 8:56:16PM
40406
40313 N Candlewyck Ln
Van's Aircraft
RV-10
Kit Manufacturer:
Kit Model:
Kit Serial Number:
Anthem, AZ 85086
Deems Davis
Owner City/State/Zip:
Owner Address:
Owner Name:
Manual Reference #
Category
Date
Partner
Hours 
2/08/2006
Mid Fuse Bulkheads
 2.75
Sec 25-3
Check the cutout's per steps 1-3 (they were already done on my parts). Final drill #12 the main gear upper flange in both gear 
brackets, usinf the "F"bushing match drill#30 the lower holes on the main gear brackets, then remove the bushing and final drill 
#12 the lower gear holes. Final drill the upper hole in the gear brackets. temporarily install the LG brackets and check that a AN3 
bolt will pass thru all of the holes just drilled. Machine countersink all of the nutplate attachments and 2 additional holes in the 
L&R bulkheads for a #10 screw. Dissassemble, deburr all parts, holes. enlarge 2 holes to 5/8" and 4 holes to 3/4" using unibit, 
scotchbrite all parts and prime.
Ditto the RIGHT
Drilling #30 and the #12 the LG brackets LEFT
Mid seat rail supports countersunk for nutplates
Page 1 of 1