Finished most of the wiring for the wings. All wires have been run through the conduit. All connectors on the wing tip end of the |
|
wires have been installed. (LED Nav, Strobes, Landing lights connected and tested. D-sub cable made and connectors installed |
|
both ends for roll servo. connector attached to roll servo and locktite and lock washers. Heated Pitot installed and tested and |
|
plumbed to pitot line . RG 400 Coax run for Nav antenna in Left wing. I'm going to wait on the inboard connectors until final |
|
wiring, I may be able to eliminate some connections. |
|