Construction Log Report
Report Created by KitLog Pro
Printed:
12/7/2005
10:07:32AM
40406
40313 N Candlewyck Ln
Van's Aircraft
RV-10
Kit Manufacturer:
Kit Model:
Kit Serial Number:
Anthem, AZ 85086
Deems Davis
Owner City/State/Zip:
Owner Address:
Owner Name:
Manual Reference #
Category
Date
Partner
Hours 
12/06/2005
Flaps
 2.50
Sec 22-6
I got borred sitting around home following the Carpel Tunnel surgery (which went very well)so I went out to the Casita to see if I 
would be able to do any workThe Drstrongly cautioned against itbut I've never followed directions wellFor this particular 
series of steps I was able to get along quite wellprobably because most of the work is done wthe pneumatic squeezerAny 
way it felt good to make at least a little progress even if it is slower than beforThe consulting gig is a go as soon as the lawyers 
can get the contracts sorted outThat will slow progressbut add $'s to the project.
Thank goodness for pneumatic squeezer
I alternated rivet heads like on the trailing edges
Here's a shot of the current handicap
Page 1 of 1