Construction Log Report
Report Created by KitLog Pro
Printed:
12/7/2005
10:07:32AM
40406
40313 N Candlewyck Ln
Van's Aircraft
RV-10
Kit Manufacturer:
Kit Model:
Kit Serial Number:
Anthem, AZ 85086
Deems Davis
Owner City/State/Zip:
Owner Address:
Owner Name:
Manual Reference #
Category
Date
Partner
Hours 
12/06/2005
Flaps
 2.50
Sec 22-6
I got borred sitting around home following the Carpel Tunnel surgery (which went very well), so I went out to the Casita to see if I 
would be able to do any work. The Dr. strongly cautioned against it, but I've never followed directions well. For this particular 
series of steps , I was able to get along quite well, probably because most of the work is done w/ the pneumatic squeezer. Any 
way it felt good to make at least a little progress even if it is slower than befor. The consulting gig is a go as soon as the lawyers 
can get the contracts sorted out. That will slow progress, but add $'s to the project.
Thank goodness for pneumatic squeezer
I alternated rivet heads like on the trailing edges
Here's a shot of the current handicap
Page 1 of 1