Finished off the Pitot tube installation, match drilled (inside out) the #19 holes, took skin off, and cutout the opening in the skin |
|
that allows the pitot attach bracket to pass through. riveted the pitot attach bracket to the rib, TruTrak roll servo arrived via UPS |
|
today, so installed it. No instructions, only a color picture and bags of parts. I think I've got everything in the right place, I left the |
|
control arm loosle attached intil setting up the final linkages and adjusting ailerons and torque tubes for final. then installed the |
|
Heated Pitot control module, it neds to be instaalled close to the pitot tube, so I made an attach plate from .032 scrap and riveted |
|
it to the rib, the used nutplates and some lp4-3 to attach the plate and the module to the adjacent rib. A lot of time consumed on |
|
what should have been fairly simple tasks. |
|