Construction Log Report
Report Created by KitLog Pro
Printed:
1/12/2006
 8:29:37PM
40406
40313 N Candlewyck Ln
Van's Aircraft
RV-10
Kit Manufacturer:
Kit Model:
Kit Serial Number:
Anthem, AZ 85086
Deems Davis
Owner City/State/Zip:
Owner Address:
Owner Name:
Manual Reference #
Category
Date
Partner
Hours 
1/12/2006
Outboard Leading Edg
 3.10
Judy
Sec 17-4
Attached Outboard leading edge to RIGHT wing spar and ribs and top skinEnlarged tie down hole to 1/using step drillAble 
to squeeze all of the rivets on the bottom sideJudy bucked the rivets on the top skin sideThe plans call for optional LP4-pop 
rivets for attaching the ribs of the OBLE to the sparand I opted to take advantage of that 9I hate bucking AN 470 with ackward 
holds for bucking barsthey always turn out with problemsI need to buck the last rivets on the inboard most rib (The one that 
is nexyt to the fuel tanksI'll do that in the morningwhere there is better lightI've still got this @$#!#@ California fluand I'
only good for a couple of hours of work each dayThe freight company called today and the Fuse kit will be delivered next Tues 
!!!!!.
Yesterday I built the wing cradleI built it out of a wings stand that someone in the valley had built for an RV-6He's an engineer
and the thing is overbuiltbut I was able to use all of the hardware and most all of the lumberI'm running out of room in the 
CasitaWent to the local EAA mtg Tues pm and Don Didder the Pres of the chapter has an empty hangerand he's willing to let 
me store the wings thereSo I guess that i've got another 2-weeks of work to finish up the Left wing (once the new rear spar 
arrives Tues). And then there will be space in the Casita to start the FuseI won't be able to complete the Fuse in thereas there 
will be no way to get it through the doorbut i can build lost of the parts and then move the project into the Garage.
Outboard leading edge attached
Squeezing botom row of Leading edge rivets
Wing Cradle
Page 1 of 2

View Pages Next Last